xCruzo
|
Wings

Boeing's new 737 assembly line starts moving in Everett By Reuters

Jets Investing.com ✦ xCruzo 🇺🇸🇪🇸
📄 Read Article
Boeing's new 737 assembly line starts moving in Everett By Reuters
Browse hubs:CarsAviationMarineMoneySports
xCruzo Brief

Boeing plans to begin operating a fourth 737 MAX assembly line at its Everett, Washington, factory on Monday, adding capacity to meet strong global demand. The new production line, known internally as the North Line, copies the three existing 737 final assembly lines in Boeing’s Renton plant. Boeing CEO Kelly Ortberg said in June that the first aircraft would be “loaded” onto the Everett line on July 6. The company is increasing 737 output from 42 to 47 jets per month after consulting with the Federal Aviation Administration. Boeing does not expect the North Line to raise rates before early 2027, when it aims for 52 aircraft per month, with studies considering up to 70. The ramp-up follows FAA production limits after a January 2024 Alaska Airlines door-plug blowout, and Boeing faces competition from Airbus’ A320neo family.

xCruzo quick-read summary • Source: Investing.com • Read the full article for complete information.
📄 Read Full Article →
xCruzo xCruzo
See your VIN Report in 15 seconds — Free
1 in 5 cars has an open recall. Is yours one of them?
Not the dealer’s report. Yours.
Choose your detail level — free to full.
For the price of a coffee.
Check My VIN — Free
Free · No credit card · Instant results
Link copied ✓